beautypg.com

Installation, Frame capacity, Module placement in the gecko 8900 video frame – Grass Valley 8981NR User Manual

Page 8

background image

8

8981NR Instruction Manual

Installation

Installation

Installation of the 8981NR module is a process of:

1.

Placing the module in the proper video frame slot, and

2.

Cabling and terminating signal ports.

The 8981NR module can be plugged in and removed from a Gecko 8900
video frame with power on. When power is applied to the module, LED
indicators reflect the initialization process (see

Power Up

on page 11

).

Frame Capacity

The 8981NR module can be installed in all Gecko 8900 video frames but
with varying maximum quantities determined by frame cooling capacity.

Table 1

provides the power capacity, cooling capacity, and maximum

module count for each frame type.

Note

Module capacity figures assume no other modules are in the frame.
X = Not recommended without forced air cooling.

Module Placement in the Gecko 8900 Video Frame

There are ten cell locations in the video frame to accommodate either
analog or digital modules. These are the left ten locations. Refer to

Figure 1

on page 9

.

The two cells on the right are allocated for the power supplies. For addi-
tional information concerning the Power Supply module, refer to the 8900
Power Supply manual.

The third cell from the right is allocated for the Frame Monitor or 8900NET
Network Interface module. These modules provide health monitoring and
control options.

Table 1. Video Frame Power Capacity

Capacity Calculated

8900TX Frame

8900TF Frame

8900TFN Frame

Power (W)

100

100

100

Recommended Module Cooling (W)

30

90

90

8981NR Modules

5

10

10