Maintenance, Preventative maintenance schedule, Chapter 5 – AEC VacTrac Series Conveying Systems User Manual
Page 86: Chapter 5: maintenance, 1 preventative maintenance schedule, Every week

Chapter 5: Maintenance
5-1 Preventative Maintenance Schedule
The checklist below contains a list of items which should be inspected and/or replaced to
keep the mechanical components of your conveying system operating at peak efficiency.
Perform each inspection at the regular intervals listed below.
System model #
Serial #
Every week
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Inspect all filters for
wear, replace/
clean if dirty or
worn.
Check to make
sure that all hose
connections are
air tight.
Every month Jan Feb Mar Apr May Jun
Jul Aug Sep Oct Nov Dec
Lock out electrical
power and inspect
electrical wiring for
integrity.
Check demand
sensor.
Inspect gaskets at
hoppers.
Inspect belt(s).
Oil & grease
(lubricate)
components
- Photocopy this page for your maintenance records -
Conveying System Mechanical Components Chapter 5: Maintenance
85 of 136