Figure 38: Volume-Fill, Time-Fill, Vacuum Receiver Wiring Connections

24 VDC Control Circuit

+24 VDC

Bin-Full switch

Hopper-Full/Bin-Full switches

To controller input for

0 VDC

Hopper-Full

Vacuum Receiver - Volume Fill

(LS)

switch

Bin-Full

switch (PRS)

Black

Blue

Vacuum Receiver - Time Fill

(LS)

Bin-Full

switch

0 VDC

From controller output for

vacuum sequence valve solenoid

From controller output for

+24 VDC

(SOL)

seq. valve

Vacuum

Brown

+24 VDC

(when using proximity switch as a Bin-Full switch)

Vacuum Receiver - Volume Fill

Bin-Full

switch

(LS)

Brown

Black

Blue

Brown

Blue

+24 VDC

0 VDC

+24 VDC

+24 VDC

O VDC

+24 VDC

Bin-Full switch

Bin-Full

switch

(LS)

Blue

Black

Brown

+24 VDC

Black

vacuum sequence valve solenoid

(SOL)

seq. valve

Vacuum

To controller input for

(SOL)

seq. valve

Vacuum

(SOL)

seq. valve

Vacuum

vacuum sequence valve solenoid

From controller output for

vacuum sequence valve solenoid

From controller output for

Hopper-Full/Bin-Full switches

To controller input for

Hopper-Full

switch (PRS)

Vacuum Receiver - Time Fill

(when using proximity switch as a Bin-Full switch)

To controller input for

Installing Station Bypass Switches
The manufacturer recommends field-installing a station bypass switch (shown below) in a
convenient location at each vacuum hopper in series with the flapper dump Bin Full (LS)
switch. Check local codes.

Turning off this bypass switch simulates a full machine bin, cancels a No-Convey alarm, and
takes the receiver out of the loading sequence until the switch is closed. This allows on-the-
fly processing changes and cancels No-Convey alarms.

If the bypass switch is turned off while a hopper is filling, the switch simulates a full vacuum
hopper and stops the conveying of material to that hopper immediately.