Pre-Start Inspection

1. Remove the front, left, and right side service

panels.

2. Check that any shipping blocks have been

removed.

3. Inspect the interior of the machine for loose

screws or wires. Check that no refrigerant lines

are rubbing each other. Check that the fan blade

turns freely (remote condenser).

4. Check that the refrigerant lines are properly

installed.

5. Check that the electrical power has been on for

at least 4 hours and that the compressor domes

are warm.

6. Check that the unit is installed correctly

according to the final check list on page 12.

Start Up

1. Go through the pre-start inspection.

2. Open the hand valve, observe that water enters

the water reservoirs, fills the tubes from the

reservoirs to the evaporators, and then shuts off.

Check for leaks.

3. Open each King (receiver service) valve.

4. Switch each master switch on.

The electrical start up sequence is automatic.

There will be a short (15 second) delay before the

gear motor starts and the liquid line valve opens,

after that the low pressure control will close and

the compressor will start.

5. The remote condenser fan turns, and the

condenser begins to discharge warm air.

6. The unit should soon be making ice, if desired

the low side pressure of each system can be

checked, it should be 32 psig + or - 2 psig. The

discharge pressure will depend upon air and water

temperatures, but should be between 205 psig and

280 psig.

7. THERE ARE NO ADJUSTMENTS TO MAKE,

so replace the panels.

8. Clean and/or sanitize the storage bin interior,

wipe off the exterior with a clean, damp cloth.

9 Give the owner/user the service manual, instruct

him/her in the operation of the unit, and make sure

they know who to call for service.

10. Fill out the manufacturer’s registration and mail

it to Scotsman.

NME1854R & FME2404R

January 2000

Page 13