FOR THE INSTALLER: Final Check List

1. Is the ice system installed

indoors in a location where the air

and water temperatures are

controlled, and where they do not

exceed the design limitations?

2. Is there an electrical service

disconnect within sight of the

installed machine? Has the

voltage been checked, and

compared to nameplate

requirements?

3. Have all the plumbing

connections been made and

checked for leaks?

4. Has the machine and bin been

leveled?

5. Is there a minimum of 6"

clearance at the rear, left, right

and above the machine for

proper service access?

6. Is the water pressure a

minimum of 20 psig?

7. Has the machine been secured

to the bin?

8. Is there a water shut off valve

installed near the machine?

9. Is the remote condenser

installed per local building codes,

and in a place where it has

adequate ventilation and minimal

solar heat gain?

10. Has all shipping material and

literature (inside the front panel)

been removed from the units?

11 Have the remote condenser

and precharged lines been

properly installed?

12. Has the electrical connection

between the Ice Machine and the

condenser been made?

13. Verify that the master

switches are in the OFF position.

14. Switch on the electrical

power.

15. Refer to Pre-Start

instructions, the next page.

NME1854R & FME2404R

January 2000

Page 12

ROOF

HOLES

SEALED?

POWER

SUPPLY?

LEVELED?

PLUMBING?

REMOTE

CONDENSER

SECURED?