10 commissioning, 1 control panel and information on commissioning, Remko wkf / wkf-compact – REMKO WKF 85 User Manual
Page 72: Commissioning, Control panel and information on commissioning
Legend for circuit diagrams
Color codes:
bl:
blue
br:
brown
gr:
gray
rt:
red
sw:
black
ws:
white
Other abbreviations:
EVU:
Utility
FBH:
Floor heater
HK:
Heating cycle
HZG:
Heating
PP:
Primary pump
PV:
Photovoltaics
RL:
Return flow
Str.Zä.Hh
Electricity meter in the
household
St.Ltg.:
Control line
UV:
Change over valve
VL:
Inlet
WE:
Heat generator
WP:
Heat pump
WW:
Warm water
10
Commissioning
10.1
Control panel and
information on commissioning
The Smart Control is used to operate and control
the entire heating system. The Smart Control is
operated from the operating unit. The operating
unit is positioned on the basic device.
n
The unit is pre-installed at the factory. After a
reset of the Smart Control, the default parame-
ters are loaded.
n
An intensive visual inspection is to be carried
out before the actual commissioning.
n
Switch on the power supply.
n
Then the preinstalled data is loaded and the
parameters can be set with the help of the
commissioning wizard. You can find informa-
tion on this in the separate operating instruc-
tions of the Smart Control.
NOTICE!
Before commissioning the domestic water
storage will be filled.
REMKO WKF / WKF-compact
72