beautypg.com

Installation instructions for qualified personnel – REMKO RVD xxx DC User Manual

Page 15

background image

Installation instructions for qualified personnel

Important points prior to in-
stallation

Transport the unit in its original
packaging as close as possible
to the installation location to
avoid transport damage.

Check the contents of the

packaging for completeness
and check the unit for visible
transport damage. Report any
damage immediately to your
contracting party and the ship-
ping company.

Lift the unit at the corners and
not by the refrigerant or con-
densation connections.

The refrigerant pipes
(injection and suction pipe),
valves and connections must be
insulated impervious to vapour
diffusion. If necessary, also insu-
late the condensation pipe.

Select an installation location
which allows air to freely flow
through the inlet and outlet.
(See section "Minimum clear-
ances").

Do not install the unit in the
immediate vicinity of devices
with intensive thermal radia-
tion. Installation near sources of
thermal radiation reduces the
output of the unit.

Open the blocking valves of the
refrigerant pipes only after the
installation is complete.

Seal off open refrigerant pipes
with suitable caps or adhesive
strips to avoid infiltration of
moisture
and never kink or compress the
refrigerant pipes.

Avoid unnecessary
bends. This minimises the pres-
sure loss in the refrigerant pipes

and ensures that the compres-
sor oil can flow back without
obstruction.

Use four supports and the as-
sociated hooks to attach the
ceiling cassette.

Use the insulated condensation
hose in the scope of delivery as
a junction piece to the continu-
ing condensate drain. Secure
the condensate drain with the
supplied clamps.

4 Fixing materials for RVD 261-681 DC

Suspension

Adapter piece

Insulation

Clamps

15