beautypg.com

Shutdown, Care and maintenance – REMKO RVD xxx DC User Manual

Page 13

background image

Prior to performing any work,
ensure the equipment is iso-
lated from the voltage supply
and secured to prevent acci-
dental switch-on!

!

CAUTION

Shutdown

Temporary shutdown

1. Allow the indoor unit to run for

2 to 3 hours in air circulation
mode or in cooling mode at the
maximum temperature setting
in order to remove any residual
moisture from the unit.

2. Shut down the unit using the

remote control.

3. Switch off the voltage supply to

the unit.

4. Cover the unit as far as pos-

sible with plastic foil in order to
protect it from the influences of
weather.

Permanent
Shutdown

Ensure that equipment and com-
ponents are disposed of in accord-
ance with local regulations, e.g.
through authorised disposal
and recycling specialists or at col-
lection points.

Contact REMKO GmbH & Co. KG
or your contract partner for a list
of specialist companies near you.

Care and maintenance

Regular care and maintenance
serves to ensure trouble-free op-
eration and long service life of the
unit.

Care

Ensure the indoor unit and out-
door component are protected
against dirt, mould and other
deposits.

Clean the equipment using a
damp cloth. Do not use any
caustic, abrasive or solvent-
based cleaning products. Do
not use a jet of water.

Clean the fins on the indoor
unit and outdoor component
prior to long shutdown periods.

Maintenance

It is recommended that
you take out a maintenance
contract with an annual service
from an appropriate specialist
firm.

Systems which operate year-
round (e.g. in server rooms),
the maintenance intervals must
be reduced accordingly.

This ensures the operational
reliability of your
equipment!

TIP

Type of task

Checks/Maintenance/Inspections

Commissioning

Monthly

Six-monthly

Yearly

General

Measure voltage and current

Check compressor/fans are functioning cor-
rectly

Check fan is functioning correctly

Dirt on liquefier/vaporiser

Check refrigerant fill quantity

Check condensation drain

Test insulation

Check moving parts

Sealing test for refrigerant circuit

1)

1) see note

The statutory regulations
require an annual sealing test
for the refrigerant circuit in
relation to the refrigerant
filling level. The inspection
and documentation is to be
carried out by corresponding
specialist engineers.

NOTE

13