Before commissioning

After the tightness check has
been successfully completed,
connect the vacuum pump via the
pressure gauge station to the valve
connections on the outdoor unit
(see chapter "Tightness check")
and create a vacuum.

Perform the following checks
prior to commissioning the
unit for the first time and after
any interventions affecting the
refrigerant circuit. Record the
results in the commissioning
report:

Check of all refrigerant pipes
and valves with leak detection
spray or soapy water for leaks
and for inadvertent mix up of
suction and injection pipe, with
the unit at a standstill.

Check of all refrigerant pipes
and insulation for damage.

Check of all electrical
connections between indoor
unit and outdoor unit for
correct polarity.

Check that all fastenings,
mountings etc. are firm and at
the correct level.

Commissioning

Commissioning should only be
performed and documented by
specially trained personnel.

Observe the manuals for the
indoor unit and outdoor unit
when commissioning the
entire system.

NOTE

The system can be commissioned

once all the components have

been connected and checked.

A functional check should be

performed to verify its correct

function and identify any unusual

operational behaviour prior to

handing it over to the operator.

This check is dependent on the

installed indoor unit.

The procedures are specified in the

manual for the indoor unit being

commissioned.

Add refrigerant

The unit contains a basic quantity
of refrigerant.
In addition, an additional amount
of refrigerant must be added for
refrigerant pipe lengths exceeding
5 meters per circuit. Refer to the
following chart:

Note that the employed
refrigerant is always filled in
liquid form!

CAUTION

NOTE

Check the overheating to
determine the refrigerant fill
quantity.

Wear protective clothing when
handling refrigerant.

CAUTION

MVT

600 DC - 1050 DC

Basic pipe length

Additional

filling quantity

Up to and incl.

5 m

0 g/m

0 g/m

5 m to max. 15 m

per circuit

30 g/m

30 g/m

REMKO MVT