Installation – Montigo MD44 DV User Manual
Page 5

Page 5
Part No. XG0120
MD44-DV Direct Vent Vented Fireplace
Installing Terminations with Built-In Frames
Installing Terminations with MSR Frames
12
12
1. Frame the termination opening to 12" x 12".
2. Fasten the termination to the studs using a minimum of 4 screws.
11
11
1. Frame the termination opening to 11" x 11".
2. Fasten the termination to the studs using a minimum
of 4 screws.
Installation
PTKOG
1. Ensure that the two long mounting brackets are facing
the bottom of the termination. (See inset). This will
provide more heat protection at the top of the
termination, where temperatures are highest.
2. Attach to the faceplate of the termination using four
sheet metal screws.
Installing Heat Guards over Terminations
MSR
PTO-3F
PTO-3
Installing Terminations with MOSR Frames
12
12
12
MOSR
1. Frame the termination opening to 12" x 12".
2. Fasten the MSR frame to the interior side of the studs
using a minimum of 4 screws.
3. Insert the termination into the MSR frame as shown
here, and attach by screwing through the four pilot
holes in the termination.
PTO-3