2 | final wiring checklist, Warning – Lencore Spectra i.Net: Installation and Operations Manual User Manual
Page 53

section 7
7.2 | final wiring checklist
FINAL WIRING CHECKLIST BEFORE POWERING UP SYSTEM
Have you checked all home runs?
Have you checked all wiring between floors (risers)?
Are you sure all grounds are properly tied between i.Net OPs?
Have you made sure all Data and Speaker wires are tested and installed?
Check polarity of all wiring throughout, especially power cables. If continuity is
reversed at any point, some or all of the i.Net OPs will be irreversibly damaged.
NEVER WORK WITH POWER WIRE, OR CONNECT POWER WIRES TO
I.NET OPs, WHILE POWER IS ON.
2
4
5
1
3
TIP
TIP! Check data wires
by going to the Sound
Manager Configurator and
refreshing i.Net OPs after
each i.Net OP
is connected. This will
help to eliminate large
trouble shooting issues
at the end of the job.
WARNING
NEVER WIRE or CONNECT
POWER TO AN i.Net OP WHILE
POWER IS ON!!! i.Net
OP will
lose its number identity.
Always connect wire to i.Net
OP while power supply is
not plugged in.
49