1 | head end equipment installation – Lencore Spectra i.Net: Installation and Operations Manual User Manual
Page 43

section 6
6.1 | head end equipment installation
HEAD END EQUIPMENT LIST:
•
i.LON®
•
Music and Paging Interface (optional)
•
SmartSwitch (optional)
•
Jordna Hub
•
FT Terminator (optional)
•
Mic Pre-Amp (Optional equipment)
•
320 watt, 48V Power supply
•
For SmartSwitch and first i.Net OP
•
For Mic Pre-Amp (optional)
Electrical Requirements:
One dedicated 120v/20 Amp circuit is suggested for the Lencore branded enclosure
Installing Head End Equipment (Din Rail and i.LON) (This may already be pre-wired)
2
1
WARNING
NOTE: Never use a ground lifter. Always use a proper three prong adapter for safety.
a
39