At the last i.Net OP:

Run the last data cable to the IN jack of the last i.Net OP in

the project.

In the last i.Net OP, run a cable from the data OUT to the head end

equipment in the data closet. This will connect to the data IN from

the last i.Net OP on the SmartSwitch.

In the last i.Net OP, click the data terminator into the data

OUT jack. This should only be installed in the last i.Net OP.

section 5

5.16 | data cables