Lencore Spectra i.Net: Installation and Operations Manual User Manual
Page 21

You have received i.Net OPs pre-numbered – see label on each i.Net OP indicating its sequence
number. Check and install each respective i.Net OP according to the drawing.
i.Net OPs are hung from the ceiling using the attached chain (supplied by Lencore). Chain length
should be cut to enable each speaker to hang 6-12” above the ceiling tile or 3” below the
ceiling deck. Make sure air can circulate around the i.NetOP and that the i.Net OP is not
touching metal in the ceiling or plenum.
NOTE: Keep the chain lengths/heights consistent throughout the installation and space.
IMPORTANT: Lencore suggests installing equipment in this sequence:
Climb ladder and access the ceiling plenum
Hang i.Net OPs in plenum area at marked locations using preferred hanging
method (powder action gun such as a Hilti-gun™ or drill and screw; check
your local building codes for allowable hanging methods and standards)
Drive nail holding clip to i.Net OP chain and i.Net OP into ceiling
NOTE: Do not permit the i.Net OPs to touch any other metal in the ceiling. Isolate
each i.Net OP with wire ties.
section 5
5.4 | hang i.Net operating platforms