9 | schematics – Lencore Spectra i.Net: Installation and Operations Manual User Manual
Page 28

section 5
5.9 | schematics
Connect each power supply and i.Lon Central Control Server and MPI to a dedicated 20
amp receptacle. Each dedicated circuit must be a 120V/20 amp.
Once each item is connected, you may visually observe in the power supply a lit green
LED, and sequencing of lights on the i.Lon® server and MPI.
The i.Lon® needs approximately two minutes to completely boot up.
You will not hear any sound for approximately 30 seconds. The OPs count down from 20
to 0 before booting up. (This permits new software/firmware uploads and tracking of
any corrupt data.)
TO POWER THE SYSTEM:
ONCE THE SYSTEM IS PLUGGED IN:
2
1
24