Start-Up

Visual Inspection of Equipment

The equipment type and arrangement should be
verified as ordered at once when it arrives at the jobsite.
When a discrepancy is found, the local Greenheck
Fan Corporation Sales Representative must be
notified immediately so that corrective action may
be investigated, also verify electrical conformance
to specifications. Unauthorized alterations and
unauthorized backcharges will not be recognized by
Greenheck Fan Corporation.

After the unit has been assembled, installed and all
utilities have been hooked up, the unit is now ready for
operation.

Check

Before starting the unit, check the following:

1. Confirm that building supply voltage matches the

voltage for which the unit is wired.

2. Check all piping and wiring penetrations made by

contractors for water tightness. All penetrations
must be made watertight to prevent water damage
to the unit and building.

3. Rotate the fan wheel manually to be sure that it is

free to operate. Remove any dirt or debris that may
have accumulated during installation.

4. Check the fan bearing setscrews for tightness.

5. Check alignment of sheaves and V-Belts (See

maintenance section).

6. Inspect all fasteners to ensure that none have

loosened during shipment.

7. Check flex coupling for proper alignment and

connect between motor shaft and fan shaft (direct
drive).

8. Check all guarding to ensure that it is securely

attached and not interfering with rotating parts.

9. Check operation of isolation and bypass dampers (if

supplied) for freedom of movement.

10. Check all electrical connections for proper

attachment.

11. Check housing and ductwork, if accessible, for

obstructions and foreign material that may damage
the fan wheel.

12. Fill drainage piping trap.

WARNING

Disconnect and secure to the OFF position all
electrical power to the fan prior to inspection or
servicing. Failure to comply with this safety precaution
could result in serious injury or death.

Additional steps for initial start-up

1. Check for proper wheel rotation by

momentarily energizing the fan.
Access to view the wheel can
be gained through the blower
housing access panel located
on the side of the fan’s tubular
housing.

One of the most frequently
encountered problems
are motors that are wired
to rotate the wheel in the
wrong direction. This is
especially true with 3-phase
installations where the motor will run in either
direction, depending on how it has been wired. To
reverse rotation of a 3-phase motor, interchange any
two of the three electrical leads. Single phase motors
can be reversed by changing internal connections as
described on the motor label or wiring diagram.

2. Fans with multi-speed motors should be checked on

low speed during initial start-up.

3. Check for unusual noise, vibration or overheating of

bearings. Refer to the “Troubleshooting” section of
this manual if a problem develops.

4. Grease may be forced out of the bearing seals during

initial start-up. This is a normal self-purging feature
for the type of bearing used on this product.

Blower Housing

Access Panel

Direction of

wheel rotation

Airflow

12