beautypg.com

5800 els, Unpacking instructions & contents – GAMMA 5800 Els STRINGING MACHINE 2 POINT SC MOUNTING (Issue 6 - July 2014) User Manual

Page 4

background image

4

5800 Els

Unpacking Instructions & Contents

Instructions for Unpacking and Preparing for Assembly

The stringing machine is shipped in three cartons, a large master carton for the stringing

machine base with tensioner module and accessories, a medium carton for the turntable

and mounting system and a smaller carton for the f oor stand post and base legs. Please
save the cartons and packing materials for possible shipments in the future.

Gamma

Sports cannot be responsible for machines that are not returned, shipped in their original,

undamaged packaging. The tools you will need to assemble the machine are provided

with the machine. Due to the weight of the tensioner unit, you may need the assistance of

someone to help lift the tensioner unit out of the carton.

Once the cartons are opened, remove all inner cartons and check to be sure that all parts

are present and accounted for.

Contents of Base & Leg Carton (MMU-15)

(1) Lower Column

(1) Upper Column with Flange Plate

(4) Legs

(1) Locking Knob Screw

(4) M8 x 25 Flat Head Screws

(4) M8 x 30 Cap Screws

(8) M8 Nuts

(6) M6 x 20 Cap Screws

(1) M8 x 25 Cap Screws for Height Adjustment

(1) String Reel Holder (M8 Threaded Pin), (1) Knob, (10) Spacers, & (2) M8 Washers

Contents of Mounting System Carton (MMU2-67)

(1) Turntable Assembly w/String Clamp Bases and Mounting Stands

(2) String Clamps

(1) 17mm Socket wrench

Contents of Large Master Carton (MMU3-15)

(1) Stringer Assembly Unit w/ Tensioner Module

(1) Power Cord

(1) Foot Pedal Tensioner Switch

(1) Tool Kit (contains side cutter, bent nose pliers, needle nose pliers, starting clamp)

(1) Straight Stringers Awl & (1) Pathf nder Specialty Awl

(1) Tools for assembly and maintenance