Stringing the frame – GAMMA 5800 Els STRINGING MACHINE 2 POINT SC MOUNTING (Issue 6 - July 2014) User Manual
Page 21
21
Clamping the First Main String
Secure the tensioned main string using the
remaining String Clamp. Repeat the proce-
dure for all of the remaining main strings and
tie off at the appropriate holes following the
racquet manufacturers specif cations.
Follow the manufacturer ’s recommended
stringing pattern for one or two piece stringing.
This will determine the starting point for the
cross strings. If applicable, tie the f rst cross
string using an appropriate starting knot.
Weaving the Cross Strings
Weave the cross strings over and under
the main strings being careful to alternate
the weave of each consecutive cross string
to be opposite of the previously installed
cross string.
STRINGING THE FRAME
Completing the String Job
Once the f nal cross string is tensioned
and clamped, tie off at the appropriate hole
specified by the racquet manufacturer .
Rotate the Hold Down Lever up and re-
move the racquet Hold Down Clamps from
the Mounting Stands. Rotate the Mounting
Stand Adjustment Knob on the Turntable
to disengage the racquet from the white
Racquet Supports and remove the racquet
from the Mounting System.
- 8800 Els STRINGING MACHINE 2 POINT SC MOUNTING (Issue 6 - July 2014) 8800 Els STRINGING MACHINE 6 POINT SC MOUNTING (Issue 9 - July 2014) 5800 Els STRINGING MACHINE 2 POINT SC MOUNTING (Issue 5B - March 2014) 5800 Els STRINGING MACHINE 6 POINT SC MOUNTING (Issue 5B - March 2014) 5800 Els STRINGING MACHINE 6 POINT SC MOUNTING (Issue 7 - June 2014) 5800 Els STRINGING MACHINE 6 POINT SC MOUNTING (Issue 6 - June 2014) 8800 Els STRINGING MACHINE 2 POINT SC MOUNTING (Issue 5B - March 2014) 5800 Els STRINGING MACHINE 6 POINT SC MOUNTING (Issue 6B - March 2014) 8800 Els STRINGING MACHINE 6 POINT SC MOUNTING (Issue 8B - March 2014)