DR Power 22-Ton (July 2013 - Present) User Manual
Page 9

CONTACT US AT www.DRpower.com 9
Due to the weight / size of the log splitter, it’s recommended that two or more adults be present to assist with the assembling.
STEP 1: ASSEMBLING THE FENDERS TO THE RESERVOIR ASSEMBLY.
1. Loosely assemble the top of the fender (2) to the fender support (3-1) with a bolt (3-2), flat washer (3-3) and locknut (3-4)
using two 13mm wrenches (Figure 2).
2. Secure a fender (2) and fender support (3-1) to the reservoir assembly with three bolts (3-2), six flat washers (3-3) and
three locknuts (3-4) using two 13mm wrenches.
3. Finish tightening the hardware to secure the top of the fender to the fender support.
(Figure 2)
REF. NO.
DECSRIPTION
QTY.
1
.................
Reservoir tank assembly
....................
1
2
.................
Fender
...........................................
2
3
.................
Hardware kit #1(not shown)
..............
1
Including:
3-1
..............
Fender support
................................
2
3-2
..............
Hex head bolt / M8 x 25
....................
8
3-3
..............
Flat washer / M8
..............................
16
3-4
..............
Lock nut / M8
.................................
8