Initial configuration, 1 initial, Configuration – Contemporary Control Systems EISC Configurable Switches User Manual User Manual
Page 19

TD021000-0MB
19
7.2.1
Initial Configuration
With a null-modem cable connecting the EISC to a suitable computer, launch the EISC
Configurator, select a COM port and then click the “Connect” button. If the EISC
Configurator cannot connect to the EISC, the error message of Figure 12 may appear.
If this should happen, check that a proper null-modem cable is used for the connection
and that suitable power is applied to the EISC. If the error in Figure 13 appears, a new
COM port must be chosen.
Figure 12 — Error Connecting to EISC
Figure 13 — COMPORT Error
Once the Configurator has connected to the EISC, the display of Figure 14 should
appear — with the Setup and Signal Strength menus now available. The File menu
will remain dimmed so long as the EISC is in communication with the EISC Configurator.
The portions of Figure 14 shown outlined in red will be unavailable (dimmed) for models
EISC12-100T/FC and EISC12-100T/FT.
- AI-FR Redundant Fibre Hubs (9 pages)
- AI Active Hubs (40 pages)
- AI-SRVR Servers to Ethernet Installation Guide (12 pages)
- AI-USB Adapters (12 pages)
- AI-SRVR Servers to Ethernet User Manual (20 pages)
- PCX20 Adapters (16 pages)
- MODHUB Active Hubs (32 pages)
- PCI20EX Adapters (12 pages)
- QuickLink Active Hubs (8 pages)
- USB222 Adapters (8 pages)
- BAScontrol20 Installation Guide (16 pages)
- BASgatewayLX (16 pages)
- BASremote Installation Guide (20 pages)
- BAScontrol20 User Manual (53 pages)
- BASremote Application Guide (13 pages)
- BASremote User Manual (firmware 2.x) (78 pages)
- BASrouter Installation Guide (Firmware 2.7.x) (24 pages)
- BASrouter Portable Installation Guide (Firmware 2.7.x) (20 pages)
- BASrouterLX Successful BASrouter Installation and Operation (3 pages)
- BASrouterLX Installation Guide (12 pages)
- BASrouterLX Application Guide (20 pages)
- CAN104 (8 pages)
- CANPCI (8 pages)
- BASview (81 pages)
- Compact Unmanaged Switches (4 pages)
- EIBA BAS Unmanaged Switches (4 pages)
- EIDX Managed Automation Switches Installation Guide for PoE Models (8 pages)
- EIPR Wired/Wireless VPN Router Installation Guide (4 pages)
- EIDX Managed Automation Switches Software Manual for Console Access (80 pages)
- EISK Managed Skorpion Switches Software Manual (83 pages)
- EIS UL864-Compliant Switches (8 pages)
- EISC Configurable Switches Installation Guide (8 pages)
- EISK Skorpion Switches EISK8-GT (4 pages)
- EISK Managed Skorpion Switches Installation Guide (4 pages)
- EIPR Wired/Wireless VPN Router Application Guide (14 pages)
- EISK Skorpion Switches EISK5-100T/FCS (4 pages)
- BACnet Cube I/O BMT-DI4 (3 pages)
- BACnet Cube I/O BMT-DI10 (3 pages)
- BACnet Cube I/O BMT-AI8 (4 pages)
- BACnet Cube I/O BMT-SI4 (3 pages)
- BACnet Cube I/O BMT-DO4 (3 pages)
- BACnet Cube I/O BMT-AO4 (3 pages)
- Sedona (27 pages)
- BACnet Cube I/O BMT-DIO4/2 (4 pages)