2 starting up, 1 check properties, 2 install system – Bronkhorst E-8000 User Manual
Page 7: 3 model key, Starting up, Check properties, Install system, Model key, 2starting up
Bronkhorst High-Tech B.V.
E-8000
7
9.17.076
2
Starting up
2.1
Check properties
Before installing a E-8000 system it is important to read the attached labels and check:
Instrument type
Power supply
Power
Fuse
Tmax
Signals
2.2
Install system
Before switching on power, please check if all external electrical connections with sensor/controllers and
FLOW-BUS (if necessary) are properly connected.
If you receive a readout unit including meters/controllers, the total system has been tested in full operation
under the nearest process-conditions.
2.3
Model key