Short‐form Operation Instruction 

 
 

 

Before installing the MASS‐VIEW®  it is important to be 
sure whether you received the right model using the 
packing list and the attached label on the instrument. 

 

 

 

Be sure the piping system is clean. For absolute 
cleanliness always install filters to assure a moisture and 
oil‐free gas stream. Install the MASS‐VIEW®  according to 
the direction of the flow arrow on the label at the back 
of the instrument.

 

 

 

Install the instrument in the line and tighten the fittings 
according to the instructions of the supplier of the 
fittings. 

 

 

Be sure the system has no leaks before applying gas 
pressure.

 

 

Electrical connections must be made with a standard 
cable or according to the hook‐up diagram in this 
manual. 

 

 

 

When the instrument is powered up the first time, a 
setup menu appears where the pre‐installed gas can be 
selected, which flow range is to be used and which 
communication type.  
Use the 4‐way button (up and down direction) for 
navigation and press the centre of the button to select. 

 

 

 

Apply power to the instrument and allow approx. 30 
minutes for warm‐up and stabilization. This may be done 
with or without gas pressure applied to the system. 

 

 

After entering the default password (which is ‘abc’) in 
the security menu, all menus can be enabled or disabled. 
Also a new password can be entered and saved.

 

 

Perform zero action if needed. See instructions at section 
3.6 zeroing procedure in this manual. 
 

 

 

Your instrument is now ready for operation.