beautypg.com

BECKHOFF C1300 User Manual

Page 20

background image

C1300 VME to II/O Interface Unit

Beckhoff II/O-System

Page 20 of 44

Version : 2.01

Date : 18.12.95

Function 05h : Absorbtion test

The light absorbtion of the fo-ring can be tested by means of this function. In this
test all connection cables of the fo-ring are partially run at about 80 % of the
normal transmission intensity using specified test telegrams. This test can be run
on all modules or on a single one selected before ( shown in the figure below ).
The C1300 interface can be tested seperately or through module address 0.

" Error at high intensity " means: The ring has even in a normal run an absorbtion
that is too high or a fraction of cables or connection occured.

" Error switching Low intensity " means, that the transmission intensity of the
module concerned cannot be reduced.

"Error at data pattern xx " shows up that in the fo-ring absorbtion is too high, after
the signal passed the last module .

" Error switching high intensity " means the module concerned cannot be reset

to full transmission intensity.

This figure shows an overview of the function call and responses possible.

channel

length

function

argument

0

argument

1

argument

2

comment

call

04

05

00

00

test all modules

04

05

01

nn

test module nn

response

04

05

00

00

there is sufficient absorbtion
(*)

04

05

02

00

error at High-Intensity

04

05

03

nn

error switching Low-Intensity
( module nn)

04

05

04

nn

error at Data pattern 1
( pattern 00) (module nn)

04

05

05

nn

error at Data pattern 2
( pattern FF) (modul nn)

04

05

06

nn

error at Data pattern 3
( pattern AA)(module nn)

04

05

07

nn

error switching High-Intensity
(Modul nn)