Avery Dennison A64 CS Stacker User Manual
Page 2
2
Stacker Full Cable
Power Cord
6. Connect the stacker full cable and stacker communication
cable between the stacker and your printer.
7. Plug the power cord to the stacker and the other end into a
grounded electrical outlet.
T h r e a d i n g S u p p l y
1. Make sure the stacker is disabled. The stacker is disabled
when the READY light is red.
2. Threading tags between tag guides:
• Thread tags under the dancer rollers and push against
the fixed guide.
• Slide the outer tag guide towards the tags leaving
space between the guides for the tags to move freely.
3. Set the pusher tag width:
• Loosen the thumbscrew on the outer tag
pusher.
• Place a sample tag between the guides and
slide the outer guide towards the tag leaving
space between the guides for the tags to
move freely.
• Tighten the thumbscrew.
4. Adjust the tag stack support bar:
• Loosen the thumbscrew on the tag support bar.
• Slide the bar left or right to the middle of the tags.
• Tighten the thumbscrew.
Communication Cable
Connector
Dancer Rollers
Fixed Guide
Outer Guide
Thumbscrew
Outer Guide
Sample Tag
Thumbscrew
Sample Tag
Communication Cable
Connector