Hardware preparation and installation, 1 overview, 2 unpacking and inspecting the rtm – Artesyn RTM ATCA-F140 Installation and Use (July 2014) User Manual
Page 19: 1 overview 2.2 unpacking and inspecting the rtm, Inst, Chapter 2

Chapter 2
RTM-ATCA-F140 Installation and Use (6806800M97F)
19
Hardware Preparation and Installation
2.1
Overview
Inspect the shipment and unpack the RTM.
Make sure environmental and power requirements are met.
Install the RTM.
2.2
Unpacking and Inspecting the RTM
The shelf should provide minimum airflow to the RTM slot according to the class B.4
requirements of the CP-TA Inter-operability document AdvancedTCA Book 1.1. This includes
the following:
2.0 cfm at 25 °C ambient temperature
2.8 cfm at 40 °C ambient temperature
4.4 cfm at 55 °C ambient temperature
Shipment Inspection
To inspect the shipment, perform the following steps:
1. Verify that you have received all items of your shipment:
Printed Quick Start Guide and Safety Notes Summary
RTM-ATCA-F140
Damage of Circuits
Electrostatic discharge and incorrect installation and removal of the blade can damage
circuits or shorten its life.
Before touching the blade or electronic components, make sure that you are working in
an ESD-safe environment.