beautypg.com

Hardware preparation and installation – Artesyn ARTM-9405 16x10GbE Installation and Use Guide (May 2014) User Manual

Page 22

background image

Hardware Preparation and Installation

ARTM-9405 16x10GbE Installation and Use (6806800P45F)

22

9. Tighten the face plate screws on the RTM.

10. Insert the front blade on the system's front, into the same slot as the RTM.

For more information on installing the front blade, see ATCA-9405 User's Manual.
As soon as the front blade is connected to the backplane, the blue LEDs on the front blade
and the RTM light up permanently. This indicates that the IPMC of the front blade and the
MMC of the RTM are powered up.

11. Close the handles of the front blade.

The blue LEDs on the front blade and the RTM start flashing. This indicates that the front
blade is informing the shelf manager that it wants to power up the payload of both the
front blade and the RTM.

12. Tighten the face plate screws on the front blade.

13. Wait until the blue LEDs on the front blade and the RTM are not lit.

The blue LED that is not lit indicates that the payload of the front blade and the RTM has
been powered up and is active.

14. Plug the interface cable into the face plate connectors, if applicable.