beautypg.com

Section 3 operation, 1 cw front panel controls and indicators, Section 4 operation -1 – AMETEK CW-P User Manual

Page 47: 1 cw front panel controls and indicators -1, Operation

background image

Operation Manual

3-1

SECTION 3

OPERATION

This section details the front panel operations of the CW series power source, including
the initialization process and some system operations.

3.1 CW Front Panel Controls and Indicators

The controls and indicators on the front panel of the CW are detailed below.
Refer to Figure 4–1.

Figure 4–1 Front Panel Controls (CW 801P)

Power Switch
Press the top portion of the switch to turn power on, press the bottom portion of
the switch to turn the power supply off. When power is turned on, the unit goes
through a power up cycle that may take several seconds before it is ready for
operation.

VOLTAGE/POWER Section
These controls and indicators, located on the left side of the front panel, are
used to measure and program the voltage/power parameters.