beautypg.com

2 split-phase supply connections 120–0–120v, 3 three–phase supply connections, 2 split-phase supply connections 120–0–120v -11 – AMETEK CW-P User Manual

Page 33: 3 three–phase supply connections -11, Table 3–2 recommended cables

background image

Elgar CW-P Series

Installation

Operation Manual

2-11

2.5.2

Split-Phase Supply Connections 120–0–120V

1. Remove the protective cover from the terminal block.

2. Route the cables through the strain relief device. Refer to Table 3–2 for cable

recommendations.

3. Connect NEUT to 120V.

4. Connect LINE to the other 120V.

Wiring across the full voltage will allow lower line currents to be used.

5. Reinstall the protective cover on the terminal block. Tighten the strain relief device.

2.5.3

Three–Phase Supply Connections

1. Remove the protective cover from the terminal block.

2. Route the cables through the strain relief device. Refer to Table 3–2 for cable

recommendations.

3. Connect one phase to LINE and Neutral to NEUT. If Neutral is not available,

connect LINE and NEUT across any of the phases.

4. Reinstall the protective cover on the terminal block. Tighten the strain relief device.

CW Model

North American

International

CW 801P

18A/300V, 3x14 AWG
O.D.=9.6 mm

16A/300V, 3x1.5 mm

2

O.D.=8.0–9.8 mm

CW 1251P and CW 2501P

25A/300V, 3x12 AWG
O.D.=11.3 mm

25A/300V, 3x2.5 mm

2

O.D.=9.6–12.0 mm
VDE approved

Table 3–2 Recommended Cables

WARNING!

To protect the operator, the wire connected to the GND

terminal must be connected to earth ground. This unit should not be operated
without an adequate ground connection.

CAUTION!

A device to disconnect the CW system from the energy supply

source is required. This switch or circuit breaker must be close to the CW
system, within easy reach of the operator, and clearly labeled as the
disconnection device for the CW system.

CAUTION! Use wire rated for currents drawn as specified
on equipment label.