beautypg.com

2 flying the array – Adamson SpekTrix User Manual

Page 39

background image

SpekTrix Series User Manual 9 of 72

There are a few ways of flying the SpeTrix system; depending on the number of riggers, and whether you’re flying
SpekTrix Subs as well.

Example 1: Flying with Subs

1. Begin by attaching the rigging frame to the top sub. One can choose to keep the Frame Attached to the
Sub during transport.
2. attach your motor/s onto the rigging Frame
. Release pins from the second sub

4. Turn the bottom Sub 180 degrees if
you’d like to fly it in a cardioid format. If
not, skip steps & 4.
5. Connect top and bottom sub with an
NL8 cable and Attach another cable to
the bottom sub’s lower socket.
6. Release the dolly pins. (place the pins back into the cabinet as to not lose any pins.)

4.2 Flying the Array

5.

4.

3.

1. & 2.

This manual is related to the following products: