Installation procedures – Pinnacle Systems MG User Manual
Page 25

Installation Procedures
Metal Box Controller Module
15
Auto Blank / Floating Blank Keyswitch................................................................................................................ J40
Pylon Length Selector ..................................................................................................................................S3 & S4
1 = Jumper
For pylons with 1” beam spacing, install the Jumper plug (just Left of D4/L4)
For pylons with 1/2” beam spacing, remove the Jumper plug (just Left of D4/L4)
EXT (Activates External Relay Check, see Standard Features) .......................................................................... J9
FLASH (Doubles response time of light curtain allow for Arc Weld Flash near light curtain ................................ J9
LATCH (Activates remote latch resetting (see Resettable Latching Relays) ....................................................... J9
FAULT RESET BUTTON (Push button to reset faults, do not hold button in) .......................................................S2
Figure 7: Multiple Pylon Controller Module Connector/Jumper Detail
Table 5: Multiple Pylon Set Controller (DUAL - SC) Module Length Jumper Chart
4"
8"
12"
16"
20"
24"
28"
32"
36"
40"
44"
48"
52"
56"
60"
64"
D0/L0
1
1
1
1
1
1
1
1
D1/L1
1
1
1
1
1
1
1
1
D2/L2
1
1
1
1
1
1
1
1
D3/L3
1
1
1
1
1
1
1
1
D4/L4
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
68"
72"
76"
80"
84"
88"
92"
96"
100"
104"
108"
112"
116"
120"
D0/L0
1
1
1
1
1
1
1
D1/L1
1
1
1
1
1
1
1
1
D2/L2
1
1
1
1
1
1
1
1
D3/L3
1
1
1
1
1
1
1
1
D4/L4