beautypg.com

Installation procedures – Pinnacle Systems MG User Manual

Page 19

background image

Alignment Procedure

1) Both pylons should be placed so that they are

mechanically aligned to one another. Make sure

that both ends of each pylon line up with each

other.

2) Slightly loosen the mounting bracket screws to

allow for slight rotational movement of Receiver

pylon.

3) Move the Receiver pylon to find its midpoint (or

sweet spot) where the unit goes from RED to

GREEN to RED.

4) Tighten the screws once you find the midpoint

and repeat the operation for the Emitter pylon.

If you still cannot get the unit to go GREEN

5) Recheck mechanical alignment.

6) The diagnostics display will indicate the distance

(in inches) of the first missing beam from the

connector end of the guard and the total number

of missing beams (i.e., 12 4 = first missing beam

is 12” from connector and a total of 4 beams are

missing or 015A = first missing beam is 1.5” from

connector and 10 beams are missing)

7) Loosen the mounting bracket corresponding to

the end of the pylon closest to the missing beam

and adjust it to get the unit to go GREEN.

If you are using mirrors, refer to Figure 3

8) Every mirror you use will increase the difficulty of

alignment and will reduce the overall maximum

optical distance you can achieve. A loss of 5%

per mirror should be used to determine the total

optical distance (i.e., 15’ through two mirrors =

16.5’ with losses).

9) You may have to rotate all mirrors in turn (starting

from the Emitter end) to find the true optical path

of infrared light. Also, you may have to toe in one

end of the mirror due to irregularities in the mirror

brackets.

NOTE: Make sure you do not exceed the total

optical path distance of 20’ or the curtain distance

that was specified.

Installation Procedures

Metal Box Controller Module

9

Figure 3: 4 Sided Guarding with Dual Stud Guard Brackets, TRM Mirrors and Model #8000 Pedestals