Led status, 1 non-poe wesii, 2 poe wesii – KBC Networks WESII User Manual
Page 29
WESII User Manual
Manual-WESII-Rev1403
Copyright © KBC Networks 2014
Page 28 of 140
www.kbcnetworks.com
1 2
3
4 5 6
7. LED Status
7.1 Non-PoE WESII
1
Status/Signal Strength Indicator – 40 RSSI
2
Signal Strength Indicator – 30 RSSI
3
Signal Strength Indicator – 20 RSSI
4
Signal Strength Indicator – 10 RSSI
5
Ethernet Link Activity
6
Power
7.1.1 LED Boot Up Process
•
Upon connection of an Ethernet cable from the PIM to the unit, the Power LED 6
will light.
•
After 1 second RSSI LEDs 1, 2 & 3 illuminate.
•
RSSI LEDs 1, 2 & 3 then go off.
•
After 5 seconds the Ethernet Link Activity LED 5, illuminates.
•
At the same time the Signal Strength Indicator, LED 1 flashes for approximately 2
seconds.
•
LEDs 1 & 5 then switch off.
•
LED 5 comes on again and flashes intermittently showing that a connection is
established.
•
After approximately 1 – 2 minutes RSSI LEDs 1, 2, 3 & 4 will light depending on
the level of signal strength.
7.2 PoE WESII
1
Signal Strength Indicator – 40 RSSI
2
Signal Strength Indicator – 30 RSSI
3
Signal Strength Indicator – 20 RSSI
4
Signal Strength Indicator – 10 RSSI
5
Not used
6
Ethernet Link Activity
7
Power
7.2.1 LED Boot Up Process
•
Upon connection of an Ethernet cable from the PSE to the unit, the Power LED 7
will light.
•
After 1 second RSSI LEDs 1, 2 & 3 illuminate.
•
RSSI LEDs 1, 2 & 3 then go off.
•
After 5 seconds the Ethernet Link Activity LED 6, illuminates.
•
At the same time the Signal Strength Indicator, LED 1 flashes for approximately 2
seconds.
•
LEDs 1 & 6 then switch off.
•
LED 6 comes on again and flashes intermittently showing that a connection is
established.
•
After approximately 1 – 2 minutes RSSI LEDs 1, 2, 3 & 4 will light depending on
the level of signal strength.