Power pack cai installation – Vortech 2007-2009 FORD GT500 OEM POWER PACK UPGRADE User Manual
Page 17

DP/N: 007125v1.0
© 2010 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured.
27AUG2010 GT500 OEM POWER PACK
12
5.
POWER PACK CAI INSTALLATION
A.
Locate the supplied vacuum hose. Using a utility
knife, cut a slit on one side of the hose the entire
length. A box cutter works best when the blade is
only exposed to cut half the hose diameter. Using
a vise to hold the utility knife in place, while run-
ning the hose over it in short lengths works best.
Use the hose parting line to ensure you cut a
straight line.
B.
Attach the vacuum hose to the heat shield as
shown. (See Figure 5-a) Trim the excess hose off.
C.
Use the remainder hose to attach to the lower
portion of the heat shield as shown. (See Figure
5-e) This will ensure the heat shield does not rub
through the A/C lines below where it will be posi-
tioned. (See Figure 5-b)
D.
Install the heat shield as shown and secure it with
the hardware from the OEM air box and the hard-
ware used to secure the ABS bracket from a pre-
vious step. (See Figure 5-c)
Fig. 5-a
Fig. 5-b
Fig. 5-c