Carrier installation – StorCase Technology DE200i-SWC User Manual
Page 30

DE200i-SW/SWC User's Guide - Rev. C01
StorCase Technology Inc.
Appendix B - Factory-Installed Options
23
4. After a short length of time the unit display will turn from a flashing unit ID number to
a steady u, indicating that the device is powered down, unlocked and ready to be
removed from the receiving frame.
NOTE:
The timer for device spin down is controlled by a small selector, located in a cutout
on the side of the DE200 receiving frame as shown in Figure 11. When the key is
turned to the OFF position, and when the timer receives a No SCSI Activity signal
from the Hot Swap Board, it waits the specified delay time before displaying a u
on the front panel of the receiving frame. The amount of time required for a drive
to spin down is approximately 15 seconds or more. This number can vary
depending on the type of SCSI device and manufacturer (some drives may require
45 seconds or more). The factory configuration is set for 20 seconds. A different
delay time may be selected with the provided alignment tool. Refer to the SCSI
device manufacturers manual for more information on required device spin down
time.
Carrier Installation
Follow the procedures below to install the DE200 Carrier into the receiving frame equipped
with the Hot Swap option.
1. Install the carrier into the receiving frame. A "u" will be present on the front panel,
indicating that the carrier is in an unlocked condition.
2. Turn the key lock mechanism, located on the front of the receiving frame, counter
clockwise to the ON position. This locks the drive into the receiving frame and activates
the Hot Swap Board. The drive will begin to spin up and the unit ID number on the display
will begin flashing.
3. After a short length of time the unit display will stop flashing, indicating that the device
is ready to be used.