beautypg.com

Carrier installation – StorCase Technology DE200i-S User Manual

Page 28

background image

DE200i-S User's Guide - Rev. D01

StorCase Technology, Inc.

Appendix B - Factory-Installed Options

21

3. As the unit ID number flashes, the Hot Swap Board monitors the activity of the SCSI

bus. When activity is no longer present, the Hot Swap Board will remove power from

the drive and then remove the device from the SCSI Bus. The unit ID number will continue

to flash during this period.

4. After a short length of time the unit display will turn from a flashing unit ID number to

a steady “u”, indicating that the device is powered down, unlocked and ready to be

removed from the receiving frame.

Carrier Installation

Follow the procedures below to install the DE200i-S Carrier into the receiving frame equipped

with the Hot Swap option.

1. Install the carrier into the Receiving Frame. A "u" will be present on the front panel,

indicating that the carrier is in an unlocked condition.

2. Turn the key lock mechanism, located on the front of the receiving frame, counter

clockwise to the ON position. This locks the drive into the receiving frame and activates

the Hot Swap Board. The drive will begin to spin up and the unit number on the display

will begin flashing.

3. After a short length of time the unit display will stop flashing, indicating that the device

is ready to be used.