beautypg.com

Solar panel installation, Toward equator, Solar panels connect in parallel – Mighty Mule FM200 User Manual

Page 22: 06 a vr-isp, D15 r20, Var1

background image

6

rev 07.25.12

1

Toward

Equator

2

POWER

ON OFF

SG1

ED1

K1

06

A

VR-ISP

D1

C2

C7

C15

LED3

D15

R20

IC4

D16

D13

D14

K2

BATT

- B

ATT+

STATUS

ANT SHLD

S9.8874

EDGE

COM

LOCK+

LOCK

-

PGOK200

Rev. X

C

M_BLK
M_RE

D

VAR2

GRN

VAR3

VAR3

VAR1

VAR4

VAR5

PF1

VAR6

WHT

GTO Inc.

Tall

aha

sse

e, F

L

CYCLE

EXIT

SAFETY

COM

CHGR

CHGR

OFF

120

AUTO CL

OSE

TIME

MIN

MAX

STALL

FORCE

3

POWER

OFF

120

AUTO CLOSE

TIME

MIN

MAX

STALL

FORCE

ON OFF

SG1

ED1

K1

06

AVR-ISP

D1

C2

C7

C15

LED3

D15

R20

IC4

D16

D13

D14

K2

BATT- BATT+

STATUS

ANT SHLD

S9.8874

EDGE

COM

LOCK+

LOCK -

PGOK200 Rev. XC

M_BLK
M_RED

VAR2

GRN

VAR3

VAR3

VAR1

VAR4

VAR5

PF1

VAR6

WHT

GTO Inc. Tallahassee, FL

CYCLE

EXIT

SAFETY

COM

CHGR

CHGR

S9.8874

4”

4

POWER

OFF

120

AUTO CLOSE

TIME

MIN

MAX

STALL

FORCE

ON OFF

SG1

ED1

K1

06

AVR-ISP

D1

C2

C7

C15

LED3

D15

R20

IC4

D16

D13

D14

K2

BATT- BATT+

STATUS

ANT SHLD

S9.8874

EDGE

COM

LOCK+

LOCK -

PGOK200 Rev. XC

M_BLK
M_RED

VAR2

GRN

VAR3

VAR3

VAR1

VAR4

VAR5

PF1

VAR6

WHT

GTO Inc. Tallahassee, FL

CYCLE

EXIT

SAFETY

COM

CHGR

CHGR

Correct

Wrong

Wrong

Wire

Screwed into

wire insulation

Exposed strands

of wire

5

POWER

ON OFF

SG1

ED1

K1

06

A

VR-ISP

D1

C2

C7

C15

LED3

D15

R20

IC4

D16

D13

D14

K2

BATT

- BA

TT+

STATUS

ANT SHLD

S9.8874

EDGE

COM

LOCK+

LOCK

-

PGOK200

Rev. X

C

M_BLK
M_RE

D

VAR2

GRN

VAR3

VAR3

VAR1

VAR4

VAR5

PF1

VAR6

WHT

GTO Inc.

Tall

aha

sse

e, F

L

CYCLE

EXIT

SAFETY

COM

CHGR

CHGR

OFF

120

AUTO CL

OSE

TIME

MIN

MAX

STALL

FORCE

6

RED

RED

BLACK

BLACK

attach BLACK to the ‘COM’ terminal
attach RED to the ‘CHGR’ terminal

Solar Panels connect in PARALLEL

Position solar panel facing sun and in a non-shaded open area

that allows 8 hours of direct sunlight for a full charge.

SOLAR PANEL INSTALLATION

For multiple solar panels, wire the panels in parallel as shown.

NOTE: Set Control Panel to the OFF Position.

Remove control panel cover by unscrewing center cover fastener.

Feed 4” of the solar panel wire through strain relief into control box.

Insert red (+) wire into CHGR terminal and the black (-) wire into

the COM terminal. Do Not Overtighten Screws.

Reattach cover. Turn power on.