beautypg.com

7 flue installation – Glow-worm EnergySaver 80 User Manual

Page 18

background image

18

221837B

Diagram 7.4

Diagram 7.5

Diagram 7.6

6863

6864

4079 S

FLUE DUCT

"Q" plus 82mm

BOILER
CENTRE
LINE

"N" minus 57mm

LONG FLUE
TERMINAL

STANDARD
FLUE TERMINAL

"N"

"Q"

2.8mm

DRILL SIZE

SEAL WITH
TAPE
SUPPLIED

AIR DUCT/TERMINAL
AND FLUE DUCT
ASSEMBLY

FLUE ELBOW
ASSEMBLY

SEALANT

AIR DUCT/
TERMINAL
AND
FLUE DUCT
ASSEMBLY

7 Flue Installation

7.4 External Flue Installation

Locate the air duct/terminal assembly into the flue elbow
assembly as shown in diagram 7.5, making sure of correct
terminal alignment of the “TOP”.

Mark the position of the air duct terminal assembly securing
holes and drill two 2.8mm diameter holes through the air duct/
terminal assembly.

Apply sealant to the flue duct and locate into air duct terminal,
see diagram 7.8.

From outside, place the air duct/terminal assembly and flue
duct into the flue hole.

Make sure that the flue terminal is correctly positioned and
projecting the correct distance from the outside wall face, see
diagram 7.11.

Apply sealant to the flue elbow spigot and then locate the flue
and air duct terminal assembly as shown in diagram 7.5, make
sure of the correct alignment of the “Top”.

Secure the air duct terminal to the flue elbow with the two self
tapping screws supplied in the loose items pack, then seal with
the tape provided.