beautypg.com

3 boiler location – Glow-worm EnergySaver 80 User Manual

Page 11

background image

11

221837B

Diagram 3.1

PERMANENT
SURFACE

*

5

*

5

5

5

150

100

500

*

INCREASE THIS DIMENSION TO

25mm FROM COMBUSTIBLE MATERIAL

CLEARANCE OPPOSITE TO FLUE EXIT
MUST BE ADEQUATE FOR THE
INTERNAL INSTALLATION

0157M

5

*

5

3 Boiler Location

NOTE:

The boiler may be installed in any room although particular
attention is drawn to the requirements of the current issue of
BS7671 with respect to the installation of a boiler in a room
containing a bath or shower.

Any electrical switch or boiler control using mains electricity
should be so situated that it cannot be touched by a person
using the bath or shower. The electrical provisions of the
Building Standards (Scotland) Regulations are applicable to
such installations in Scotland.

The boiler must be mounted on a flat wall which is sufficiently
robust to take its total weight, see Data Table 1.

3.1 Boiler Clearances

The boiler must be positioned so that at least the minimum
operational and servicing clearances are as shown in diagram
3.1.

Additional clearances may be required around the boiler for
installation purposes, dependent upon site conditions.

3.2 Timber Frame Buildings

If the boiler is to be installed in a timber frame building it should
be fitted in accordance with the Institute of Gas Engineers
document IGE/UP/7/1998. If in doubt seek advice from the
local gas undertaking or Hepworth Heating Ltd.

3.3 Room Ventilation

The boiler is room sealed, so when installed in a room or space
a permanent air vent is not required.

3.4 Cupboard or Compartment Ventilation

Where the boiler is fitted in a cupboard or compartment,
permanent high and low level ventilation must be provided. The
ventilation areas required are given in Table 4.

Where the installation of the boiler will be in an unusual location,
special procedures are necessary, refer to the current issue of
BS6798 for guidance.

Make sure that the cupboard or compartment air vents are
positioned to be clear of obstructions at all times.

A compartment used to enclose the boiler must be designed
and constructed specifically for this purpose.

The doorway opening should be of sufficient size to allow for
easy removal of the boiler.

high level

low level

cms

in

2

cms

in

2

TABLE 4

ENERGYSAVER 70

high level

low level

cms

in

2

cms

in

2

TABLE 4

ENERGYSAVER 80

Ventilation from

240

37.2

240

37.2

room

Ventilation from

120

18.6

120

18.6

outside

Ventilation from

210

32.6

210

32.6

room

Ventilation from

105

16.3

105

16.3

outside