beautypg.com

6 installation preparation – Glow-worm 18-30sxi Range User Manual

Page 17

background image

17

0020008155A

Diagram 6.1

6.1 Appliance Pack

IMPORTANT: With regards to the Health and Safety Manual
Handling requirements, two persons shall be required to lift the
appliance, refer to manual handling on page 5.

Please check the contents of packs as shown in diagram 6.1.

NOTE: The fixing pack is located in the base polystyrene
packing under the boiler base.

Remove the polystyrene end packing pieces then carefully lay
the boiler on its back, remove the two front casing panel
securing screws and lift off the panel from two retaining lugs.

Remove the transit packaging behind the front panel and
discard.

Carefully place front panel and screws to one side.

6 Installation Preparation

12346