Fx25 operator’s manual – Ditch Witch FX25 User Manual
Page 91

Service - 90
FX25 Operator’s
Manual
As Needed
CMW
Change Blower Relief Air Filter
Check air filter whenever vacuum gauge goes
over 16” (406 mm) of mercury. Change as
needed.
1.
Remove clamp.
2.
Remove filter and discard.
3.
Install new filter.
4.
Replace clamp.
Empty Cyclonic Separator Canister
Empty cyclonic separator canister (2) as needed.
Open door and dump tank. Clean out cyclone
through upper access door (1) as needed.
NOTICE: Operating system above 16” (406
mm) of mercury may result in blower damage.
IMPORTANT: Depressurize tank before
emptying cyclonic canister, cleaning filter,
clearing hoses or opening any doors.
j32om053h.eps
j32om053h.eps
11
22
j32om025h.eps
j32om025h.eps
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)