Fx25 operator’s manual – Ditch Witch FX25 User Manual
Page 84

FX25 Operator’s
Manual
Service - 83
100 Hour
CMW
Change Fuel Filter
Replace filter every 100 hours.
1.
Remove filter.
2.
Install new filter. Apply fuel oil thinly over the
gasket and hand-tighten.
Change Blower Oil
Change oil after the first 100 hours of operation,
and every 1000 hours thereafter. Change oil more
frequently if working in dusty conditions.
•
Drain at drain plug (4) while oil is warm.
•
Add SGL at fill (2) until oil is at halfway point
on sight glass (3).
Change Hydraulic Fluid (DC Units)
Change hydraulic fluid after the first 100 hours, and
every 1000 hours thereafter. Drain hydraulic fluid
(2), add THF at hydraulic fluid fill (1) and check
level.
j32om042h.eps
j32om042h.eps
4
2
3
j32om047h.eps
j32om047h.eps
1
2
j32om048h.eps
j32om048h.eps
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)