Service precautions, Working under raised debris tank, Fx25 operator’s manual – Ditch Witch FX25 User Manual
Page 63

Service - 62
FX25 Operator’s
Manual
Service Precautions
CMW
Service Precautions
Working Under Raised Debris Tank
1.
Raise vacuum tank.
2.
Remove cylinder lockout tool.
3.
Place channel of lock around extended cylinder
and secure.
4.
Lower vacuum tank until load is supported by
cylinder lockout tool.
Incorrect procedures could result in death, injury, or property damage.
Learn to use equipment correctly.
To help avoid injury:
•
Unless otherwise instructed, all service should be performed with engine off.
•
Refer to engine manufacturer’s manual for engine maintenance instructions.
Crushing weight could cause death or serious injury. Use proper
procedures and equipment or stay away.
To help avoid injury: Use tools (provided with unit) if hydraulic system must be serviced
with tank tilted up.
FX_Tank_Raised.eps
FX_Tank_Raised.eps
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)