2000 hour, Vacuum system, Fx20 operator’s manual – Ditch Witch FX20 User Manual
Page 74
FX20 Operator’s Manual
Service - 73
2000 Hour
CMW
2000 Hour
Vacuum System
Replace Water Pump Belt
Replace belt every 2000 hours.
Replace Blower Belt
Replace belt every 2000 hours.
1.
Turn off engine.
2.
Remove covers.
3.
Loosen 4 bolts from underneath skid.
4.
Loosen u-bolt (4) to allow blower to slide.
5.
Slide pump and remove belt.
6.
Install new belt.
7.
Insert prybar in hole (3) and move blower
until belt is tight.
8.
Tighten 4 bolts and u-bolt.
9.
Loosen bolt on tensioner (1) and apply wrench to large nut.
10. Tighten tensioner until the fixed bar is 3.5 lines from the bottom of the scale on the tensioner arm.
11. Install covers.
Location
Task
Notes
Vacuum
System
Replace water pump belt
Replace blower belt
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)