100 hour, Vacuum system, Fx20 operator’s manual – Ditch Witch FX20 User Manual
Page 70
FX20 Operator’s Manual
Service - 69
100 Hour
CMW
100 Hour
Vacuum System
Change Water Pump Oil
Change oil after the first 25 hours of operation
and every 100 hours thereafter. Change oil more
frequently if working in dusty conditions.
•
Drain at drain plug (2) while oil is warm.
•
Refill with NDO at fill (1) until oil is at halfway
mark on dipstick.
Check Blower Drive Components
Check drive components every 100 hours. Adjust
and tighten if necessary.
Location
Task
Notes
Vacuum
System
Change water pump oil
NDO
Check blower drive components
Change engine oil
GEO
Debris Tank
Check tank deflector
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)