Planning, Setting up at jobsite, Vacuuming – Ditch Witch FX20 User Manual
Page 29: Fx20 operator’s manual
Operation Overview - 28
FX20 Operator’s Manual
Planning
CMW
Planning
1.
Gather information about jobsite (page 32).
2.
Inspect jobsite (page 33).
3.
Check supplies and prepare equipment (page 35).
Setting Up at Jobsite
1.
Prepare jobsite (page 34).
2.
Position vacuum excavation unit.
3.
Leave unit hitched to towing vehicle or properly stabilized if trailer-mounted unit.
4.
Block trailer wheels if trailer-mounted unit.
Vacuuming
1.
Connect hoses (page 44).
2.
Start unit (page 44).
3.
Remove debris (page 45).
4.
Disconnect hoses.
5.
Drain tank (page 48).
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)