Ditch Witch JT2020 User Manual
Page 183

Service - 182
JT2020 Mach 1 Operator’s
Manual
1000 Hour
CMW
Lube Rotation Gearbox Internal Splines
Lube rotation gearbox internal splines with EPG every 1000 hours.
To lube:
•
Turn battery disconnect switch to the off position.
•
Clean rotation gearbox area with pressure washer to remove grime.
•
Disconnect hose and remove water swivel.
•
Using special socket, remove thrust locknut, tang lock washer, and nut.
•
Remove sliding shaft from front side of gearbox. Clean and dry all components.
•
Coat internal splines in gearbox with EPG.
•
Reinstall shaft and components in reverse order of removal.
•
Apply EPS spray lube to sliding shaft surfaces. See page 176.
•
Turn battery disconnect switch to the on position.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)