Connect drill pipe – Ditch Witch JT2020 User Manual
Page 100
JT2020 Mach 1 Operator’s Manual
Conduct a Bore - 99
Assemble Drill String
CMW
Connect Drill Pipe
1.
Start drilling unit engine.
2.
Align drill pipe in front wrench.
3.
Clamp tool joint in front wrench. See “Clamp Pipe” on page 96.
4.
Load pipe:
•
Make sure pipe box is positioned correctly.
•
Lower pipe lifters.
•
Close grippers.
•
Lubricate pipe threads (pipe loader end).
•
Lubricate pipe threads (front wrench end).
•
Move pipe to spindle.
•
Raise pipe lifters.
5.
Connect pipe:
•
Move carriage forward until pipe joints meet at front wrench.
•
Rotate spindle clockwise. Carriage will move forward as pipe threads tighten.
•
Rotate clockwise until spindle stops turning, and joint is fully tightened.
•
Open grippers.
•
Retract shuttles fully.
•
Open front wrench.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)