beautypg.com

Working under drilling unit – Ditch Witch JT2020 User Manual

Page 162

background image

JT2020 Mach 1 Operator’s

Manual

Service - 161

Service Precautions

CMW

Working Under Drilling Unit

Before working under area of drilling unit

supported by a stabilizer, make sure drilling unit is parked on

hard surface.

1.

Remove cylinder locks from storage at rear of pipe box and place over extended cylinder rods (shown)
with curved ends toward stabilizer shoes.

2.

Raise stabilizers to lower unit until load is supported by cylinder locks.

If working under

raised drill frame, support front and back of drill frame with jack stands or equivalent

brace capable of supporting the weight of the unit.

Crushing weight could cause death or serious injury. Use

proper procedures and equipment or stay away.