Ditch Witch JT2020 User Manual
Page 173

Service - 172
JT2020 Mach 1 Operator’s
Manual
Startup/10 Hour
CMW
Check Pipe Auto Lubricator TJC Level
Check pipe auto lubricator TJC level before startup and every 10 hours of operation. Change pail as
needed. See “Change Auto Lubricator TJC Pail” on page 186 for procedure.
Clean Drilling Fluid Y-Strainer
Clean drilling fluid y-strainer before startup and every 10 hours of operation. Ensure that strainer is free of
debris.
NOTICE: Ditch Witch tool joint compound is specially formulated to work with Ditch Witch pipe
lubrication system. Use of other tool joint compounds will clog system. See “Recommended Lubricants/
Service Key” on page 163 for more information.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)