Appendix b: maintenance guide – American Energy Systems Harvester User Manual
Page 45
Version
6.0d
45
APPENDIX B: MAINTENANCE GUIDE
(CONT’D)
Replacing the Door / Glass Gaskets
To replace the gaskets, remove the door by lifting it
straight up off its hinge pins and laying it face down
on a soft surface. Remove the door gasket (you
may need to use pliers) and then remove the glass
retaining clips and remove glass. Strip off old
gasket around glass and clean glass well. Clean out
old stove gasket material from gasket track. Once
the door and glass are clean, apply gasket material
to glass surface and return glass to door, securing
with clips (Use care not to over-tighten). Then
apply a generous bead of gasket cement into the
track. Position the NEW gasket into track and
gently press into door. Trim off any excess gasket
and wipe away excess cement. Let the cement set
24 hours before placing door back on unit and using
the unit. Gasket material and cement may be
obtained from your dealer.
Replacing the Glass
Remove the door gasket (you may need to use
pliers) and then remove the glass retaining clips and
remove glass. Replacement glass should be 0.200”
(5mm) thick. Overall size of the glass is 16”
(405mm) wide by 11” (279mm) high, cut to an
irregular shape to fit the door front. Your unit uses
KERA LITE®
, or a similar ceramic type high
temp glass. Do not use any other than
recommended glass type in this unit. Replacement
glass may be obtained from your dealer. Clean out
old stove gasket material from gasket track. Once
the area is clean, apply gasket material to new glass
surface and return glass to door, securing with clips
(Use care not to over-tighten).
Adjusting the Doors
The doors of your Harvester Pellet Stove may need
some adjustment due to shipping vibrations, jarring
during installation and extended use. As it is
important that the doors fit properly to remain
airtight, it is suggested that you periodically check
the alignment of the doors. To adjust the doors
…………….